Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0186 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,265 | $1,500 | Not Implemented |
KU0186 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,272 | $980 | Not Implemented |
KU0186 # 03 Y:1986 | 03 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $4,780 | $800 | Implemented |
KU0186 # 04 Y:1986 | 04 | 1986 | INSULATE BARE EQUIPMENT | $1,657 | $1,500 | Implemented |
KU0186 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $896 | $725 | Implemented |
KU0186 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $360 | $0 | Implemented |
KU0186 # 07 Y:1986 | 07 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $406 | $0 | Implemented |
KU0186 # 08 Y:1986 | 08 | 1986 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $396 | $385 | Implemented |
KU0186 # 09 Y:1986 | 09 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $215 | $400 | Not Implemented |
KU0186 # 10 Y:1986 | 10 | 1986 | USE OPTIMUM TEMPERATURE | $205 | $0 | Implemented |
KU0186 # 11 Y:1986 | 11 | 1986 | INSULATE BARE EQUIPMENT | $187 | $172 | Implemented |
KU0186 # 12 Y:1986 | 12 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $177 | $30 | Implemented |
KU0182 # 01 Y:1986 | 01 | 1986 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $109,167 | $1,000,000 | Not Implemented |
KU0182 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,883 | $10,000 | Implemented |
KU0182 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,269 | $20 | Not Implemented |
KU0182 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $418 | $700 | Implemented |
KU0182 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $3,144 | $3,000 | Implemented |
KU0182 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $882 | $2,000 | Implemented |
KU0182 # 07 Y:1986 | 07 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $801 | $1,400 | Not Implemented |
KU0181 # 01 Y:1985 | 01 | 1985 | INSULATE BARE EQUIPMENT | $10,210 | $1,200 | Implemented |
KU0181 # 02 Y:1985 | 02 | 1985 | IMPROVE LUBRICATION PRACTICES | $2,813 | $750 | Implemented |
KU0181 # 03 Y:1985 | 03 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,466 | $3,000 | Not Implemented |
KU0181 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,446 | $600 | Implemented |
KU0181 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $891 | $150 | Implemented |
KU0181 # 06 Y:1985 | 06 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $260 | $0 | Not Implemented |