Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0012 # 02 Y:1987 | 02 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,052 | $3,750 | Implemented |
RU0012 # 03 Y:1987 | 03 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $568 | $0 | Not Implemented |
RU0012 # 04 Y:1987 | 04 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $213 | $82 | Implemented |
RU0012 # 05 Y:1987 | 05 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $5,664 | $2,800 | Implemented |
RU0012 # 06 Y:1987 | 06 | 1987 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $695 | $710 | Implemented |
RU0008 # 01 Y:1987 | 01 | 1987 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,791 | $456 | Implemented |
RU0008 # 02 Y:1987 | 02 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,023 | $600 | Not Implemented |
RU0008 # 03 Y:1987 | 03 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,104 | $1,200 | Implemented |
RU0008 # 04 Y:1987 | 04 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $828 | $400 | Implemented |
RU0008 # 05 Y:1987 | 05 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112 | $42 | Implemented |
ST0072 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,729 | $90 | Implemented |
ST0072 # 02 Y:1986 | 02 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $698 | $1,000 | Implemented |
ST0072 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $807 | $537 | Implemented |
ST0072 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,017 | $0 | Implemented |
ST0072 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,719 | $4,200 | Not Implemented |
ST0072 # 06 Y:1986 | 06 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $20,785 | $36,000 | Implemented |
ST0072 # 07 Y:1986 | 07 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,345 | $813 | Implemented |
ST0072 # 08 Y:1986 | 08 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $463 | $486 | Implemented |
ST0072 # 09 Y:1986 | 09 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,026 | $30,000 | Not Implemented |
ST0072 # 10 Y:1986 | 10 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $60,934 | $175,000 | Not Implemented |
ST0073 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,796 | $80 | Implemented |
ST0073 # 02 Y:1986 | 02 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,101 | $0 | Implemented |
ST0073 # 03 Y:1986 | 03 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $7,099 | $4,042 | Implemented |
ST0073 # 04 Y:1986 | 04 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $572 | $276 | Not Implemented |
ST0073 # 05 Y:1986 | 05 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,465 | $0 | Implemented |