Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0356 # 01 Y:1996 | 01 | 1996 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $29,400 | $118,450 | Implemented |
MA0356 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,644 | $3,000 | Implemented |
MA0356 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,838 | $0 | Implemented |
MA0356 # 04 Y:1996 | 04 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,672 | $10,000 | Not Implemented |
MA0356 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $448 | $0 | Not Implemented |
ME0180 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,951 | $17,121 | Implemented |
ME0180 # 02 Y:1996 | 02 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,006 | $1,023 | Implemented |
ME0180 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $2,367 | $2,500 | Implemented |
ME0180 # 04 Y:1996 | 04 | 1996 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $263 | $0 | Implemented |
ME0180 # 05 Y:1996 | 05 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $15,370 | $14,700 | Not Implemented |
ME0180 # 06 Y:1996 | 06 | 1996 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $12,262 | $0 | Implemented |
ME0180 # 07 Y:1996 | 07 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $5,658 | $400 | Implemented |
ME0180 # 08 Y:1996 | 08 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,050 | $1,330 | Implemented |
ME0181 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,271 | $27,695 | Implemented |
ME0181 # 02 Y:1996 | 02 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,099 | $632 | Implemented |
ME0181 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $1,990 | $1,130 | Implemented |
ME0181 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,653 | $750 | Implemented |
ME0181 # 05 Y:1996 | 05 | 1996 | CLOSE OFF UNNEEDED STEAM LINES | $2,370 | $200 | Implemented |
ME0181 # 06 Y:1996 | 06 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,212 | $1,000 | Implemented |
ME0181 # 07 Y:1996 | 07 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,069 | $0 | Implemented |
ME0181 # 08 Y:1996 | 08 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $923 | $400 | Implemented |
ME0181 # 09 Y:1996 | 09 | 1996 | INSULATE BARE EQUIPMENT | $596 | $305 | Not Implemented |
ME0181 # 10 Y:1996 | 10 | 1996 | PAY UTILITY BILLS ON TIME | $1,608 | $0 | Implemented |
OK0483 # 01 Y:1996 | 01 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $51,060 | $0 | Not Implemented |
OK0483 # 02 Y:1996 | 02 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,400 | $0 | Implemented |