IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0356 # 01 Y:1996 01 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,400 $118,450 Implemented
MA0356 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,644 $3,000 Implemented
MA0356 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,838 $0 Implemented
MA0356 # 04 Y:1996 04 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,672 $10,000 Not Implemented
MA0356 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $0 Not Implemented
ME0180 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,951 $17,121 Implemented
ME0180 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,006 $1,023 Implemented
ME0180 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $2,367 $2,500 Implemented
ME0180 # 04 Y:1996 04 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $263 $0 Implemented
ME0180 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,370 $14,700 Not Implemented
ME0180 # 06 Y:1996 06 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $12,262 $0 Implemented
ME0180 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,658 $400 Implemented
ME0180 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,050 $1,330 Implemented
ME0181 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,271 $27,695 Implemented
ME0181 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,099 $632 Implemented
ME0181 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $1,990 $1,130 Implemented
ME0181 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,653 $750 Implemented
ME0181 # 05 Y:1996 05 1996 CLOSE OFF UNNEEDED STEAM LINES $2,370 $200 Implemented
ME0181 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,212 $1,000 Implemented
ME0181 # 07 Y:1996 07 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $1,069 $0 Implemented
ME0181 # 08 Y:1996 08 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $923 $400 Implemented
ME0181 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $596 $305 Not Implemented
ME0181 # 10 Y:1996 10 1996 PAY UTILITY BILLS ON TIME $1,608 $0 Implemented
OK0483 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $51,060 $0 Not Implemented
OK0483 # 02 Y:1996 02 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,400 $0 Implemented