IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0874 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,850 $4,340 Implemented
AM0874 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $49,585 $3,600 Implemented
AM0874 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,970 $18 Implemented
AM0874 # 06 Y:2023 06 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,900 $35 Not Implemented
AM0874 # 07 Y:2023 07 2023 USE PHOTOCELL CONTROLS $1,050 $960 Implemented
NT0001 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,144 $5,801 Implemented
NT0001 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,452 $9,984 Implemented
NT0001 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,130 $1,258 Implemented
NT0001 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,448 $9,020 Not Implemented
NT0001 # 05 Y:2023 05 2023 INSTALL SET-BACK TIMERS $883 $0 Implemented
NT0001 # 06 Y:2023 06 2023 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,710 $0 Implemented
NT0001 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,707 $6,472 Implemented
TR0034 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $31,116 $50,670 Not Implemented
TR0034 # 02 Y:2022 02 2022 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $5,133 $79,969 Not Implemented
TR0034 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,602 $2,500 Implemented
TR0034 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,468 $36,208 Implemented
TR0034 # 05 Y:2022 05 2022 REDUCE HEAT GAIN BY WINDOW TINTING $56 $846 Not Implemented
TR0036 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $755 Implemented
TR0036 # 02 Y:2022 02 2022 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $3,510 $40,423 Not Implemented
TR0036 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $105,888 $1,890,673 Not Implemented
TR0031 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $15,178 $384,300 Not Implemented
TR0031 # 02 Y:2022 02 2022 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $122,147 $1,154,745 Not Implemented
TR0031 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $1,258 Implemented
TR0031 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $1,434 Implemented
TR0031 # 05 Y:2022 05 2022 MAINTAIN MACHINES TO REDUCE LEAKS $1,263 $684 Implemented