IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0937 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,762 $2,000 Not Implemented
UD0937 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $114 $150 Implemented
UD0937 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,682 $20,800 Not Implemented
UD0937 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,268 $4,200 Not Implemented
UD0937 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,212 $3,075 Not Implemented
UD0937 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $330 $1,911 Implemented
UD0937 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $948 $0 Implemented
UA0149 # 01 Y:2015 01 2015 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $399,011 $500,000 Not Implemented
UA0149 # 02 Y:2015 02 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $193,249 $400,000 Not Implemented
UA0149 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,435 $41,578 Implemented
UA0149 # 04 Y:2015 04 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,808 $3,396 Not Implemented
UA0149 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,614 $2,218 Not Implemented
UA0149 # 06 Y:2015 06 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $37,056 $105,000 Not Implemented
UA0149 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,942 $3,180 Implemented
UA0149 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,089 $500 Not Implemented
OK0927 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $19,646 $14,000 Not Implemented
OK0927 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,107 $133,275 Implemented
MI0287 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,717 $1,400 Not Implemented
MI0287 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,892 $10,800 Implemented
MI0287 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,014 $4,218 Implemented
MI0287 # 04 Y:2015 04 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,439 $160 Not Implemented
MI0287 # 05 Y:2015 05 2015 USE OPTIMUM THICKNESS INSULATION $2,395 $8,535 Not Implemented
MI0287 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,450 $3,140 Implemented
MI0287 # 07 Y:2015 07 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,047 $280 Not Implemented
MI0287 # 08 Y:2015 08 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $907 $336 Not Implemented