IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0324 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $855 $1,373 Not Implemented
BD0021 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,801 $5,910 Not Implemented
BD0021 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $286 $250 Not Implemented
BD0021 # 03 Y:1995 03 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,524 $20 Implemented
BD0021 # 04 Y:1995 04 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $52 $20 Not Implemented
BD0021 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $1,064 Not Implemented
BD0021 # 06 Y:1995 06 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,041 $552 Implemented
BD0021 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186 $285 Not Implemented
UF0106 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,268 $2,638 Implemented
UF0106 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,054 $17,625 Implemented
UF0106 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,861 $1,000 Implemented
UF0106 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,255 $5,200 Not Implemented
UF0106 # 05 Y:1995 05 1995 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $189,560 $950,000 Not Implemented
UF0106 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $925 $1,425 Implemented
UF0106 # 07 Y:1995 07 1995 OPERATE BOILERS ON HIGH FIRE SETTING $5,249 $0 Not Implemented
NC0047 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,390 $60 Implemented
NC0047 # 02 Y:1995 02 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,105 $320 Not Implemented
NC0047 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,787 $3,000 Implemented
NC0047 # 04 Y:1995 04 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,881 $1,500 Not Implemented
NC0047 # 05 Y:1995 05 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,139 $3,000 Not Implemented
NC0047 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,550 $4,020 Implemented
NC0047 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $5,148 $906 Not Implemented
MO0137 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,221 $1,250 Not Implemented
MO0137 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,890 $100 Implemented
MO0137 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $12,445 Implemented