IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0270 # 06 Y:1988 06 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,192 $0 Not Implemented
KU0270 # 07 Y:1988 07 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,329 $7,575 Implemented
KU0270 # 08 Y:1988 08 1988 INSTALL TIMERS AND/OR THERMOSTATS $4,749 $15 Not Implemented
KU0270 # 09 Y:1988 09 1988 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,221 $0 Not Implemented
KU0270 # 10 Y:1988 10 1988 TREAT AND REUSE RINSE WATERS $2,921 $4,700 Not Implemented
LT0130 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $859 $600 Implemented
LT0130 # 02 Y:1988 02 1988 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $398 $230 Not Implemented
LT0130 # 03 Y:1988 03 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,270 $0 Implemented
LT0130 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $3,190 $1,625 Not Implemented
LT0130 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,450 $1,781 Not Implemented
LT0130 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,810 $0 Implemented
LT0130 # 07 Y:1988 07 1988 INSTALL TIMERS AND/OR THERMOSTATS $590 $300 Implemented
LT0130 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,734 $183 Not Implemented
LT0131 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $800 $2,400 Implemented
LT0131 # 02 Y:1988 02 1988 REDESIGN PROCESS $21,900 $20,130 Not Implemented
LT0131 # 03 Y:1988 03 1988 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $930 $1,760 Implemented
LT0131 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $138 $362 Implemented
LT0131 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $284 $0 Implemented
LT0131 # 06 Y:1988 06 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $860 $100 Implemented
LT0131 # 08 Y:1988 08 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $85 $0 Implemented
LT0132 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $1,820 $1,967 Implemented
LT0132 # 02 Y:1988 02 1988 REDESIGN PROCESS $23,180 $3,057 Not Implemented
LT0132 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $352 $855 Not Implemented
LT0132 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $256 $300 Implemented
LT0132 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50 $120 Not Implemented