IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1702 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,132 $16,213 Not Implemented
CL1702 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,978 $250 Not Implemented
CL1702 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,002 $2,080 Not Implemented
CL1702 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $2,406 $0 Not Implemented
MA0784 # 01 Y:2017 01 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $64,908 $71,450 Implemented
MA0784 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,884 $24,000 Not Implemented
MA0784 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,360 $16,650 Not Implemented
MA0784 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,530 $41,013 Implemented
MA0784 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,498 $18,391 Implemented
MA0784 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,233 $16,685 Not Implemented
MA0784 # 07 Y:2017 07 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,491 $500 Not Implemented
MI0323 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,478 $51,292 Implemented
MI0323 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,440 $49,900 Implemented
MI0323 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $8,856 $2,800 Implemented
MI0323 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,603 $5,810 Not Implemented
MI0323 # 05 Y:2017 05 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,024 $26,400 Not Implemented
MI0323 # 06 Y:2017 06 2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,290 $7,150 Implemented
MI0323 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,380 $1,660 Implemented
MI0323 # 08 Y:2017 08 2017 USE SOLAR HEAT TO HEAT WATER $1,635 $1,500 Implemented
UU0123 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $22,871 $23,400 Implemented
UU0123 # 02 Y:2017 02 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,624 $13,970 Implemented
UU0123 # 03 Y:2017 03 2017 METER WASTE WATER $4,100 $0 Not Implemented
UU0123 # 04 Y:2017 04 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,374 $5,770 Implemented
UU0123 # 05 Y:2017 05 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,114 $4,625 Implemented
MZ0238 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,673 $17,248 Implemented