IAC Center University of Massachusetts
Assessment Year 2017
Principal Product Waste water treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $24,800,000
# of Employees 43
Plant Area (Sq.Ft.) 100,000
Annual Production 6,205,000 not found
Production Hrs. Annual 8,760
Location (State) NH
Source Yearly Cost Usage
Electricity Usage $1,034,023 11,995,247
Electricity Demand $316,099 24,352
Electricity Fees $7,690 -
TOTAL ENERGY COSTS $1,357,812
RECOMMENDED SAVINGS* $164,904 *Non-energy impacts
included in savings.
IMPLEMENTED SAVINGS* -
#|Description Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW/month
01: 2.4131 REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE Savings:
$64,908
Cost:
$71,450
$64,908 754,740 - - $64,908
754,740
kWh
-
-
kW/month
02: 2.4143 USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM Savings:
$35,884
Cost:
$24,000
$35,884 417,259 - - $35,884
417,259
kWh
-
-
kW/month
03: 2.4143 USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM Savings:
$26,360
Cost:
$16,650
$26,360 306,514 - - $26,360
306,514
kWh
-
-
kW/month
04: 2.7143 USE MORE EFFICIENT LIGHT SOURCE Savings:
$14,530
Cost:
$41,013
$12,025 139,823 $2,505 193 $12,025
139,823
kWh
$2,505
193
kW/month
05: 2.7143 USE MORE EFFICIENT LIGHT SOURCE Savings:
$6,498
Cost:
$18,391
$5,097 59,271 $1,401 108 $5,097
59,271
kWh
$1,401
108
kW/month
06: 2.4141 USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS Savings:
$14,233
Cost:
$16,685
$14,233 165,495 - - $14,233
165,495
kWh
-
-
kW/month
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,491
Cost:
$500
$2,491 28,963 - - $2,491
28,963
kWh
-
-
kW/month
TOTAL RECOMMENDED Savings:
$164,904
Cost:
$188,689
$160,998 1,872,065 $3,906 301 -
-
kWh
-
-
kW/month
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW/month
$ kWh $ kW/month
Electricity Usage Electricity Demand Electricity Usage Electricity Demand