IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0041 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $569 $1,827 Not Implemented
IC0041 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $2,577 $10,720 Not Implemented
IC0041 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $5,000 Implemented
IC0041 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $9,358 $8,500 Implemented
IC0041 # 07 Y:2002 07 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $16,000 $8,000 Implemented
IC0041 # 08 Y:2002 08 2002 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $114,000 $335,000 Not Implemented
UF0306 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $5,064 Implemented
UF0306 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,764 $7,800 Not Implemented
UF0306 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,327 $0 Implemented
UF0306 # 04 Y:2002 04 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $592,558 $1,120,000 Not Implemented
UF0306 # 05 Y:2002 05 2002 RECOVER AND REUSE WASTE MATERIAL $10,048 $0 Not Implemented
UF0306 # 06 Y:2002 06 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $48,671 $1,074 Not Implemented
UF0306 # 07 Y:2002 07 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $208,938 $33,980 Not Implemented
UF0306 # 08 Y:2002 08 2002 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $107,170 $114,485 Not Implemented
WI0428 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,872 $18,000 Not Implemented
WI0428 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $6,258 $2,100 Not Implemented
WI0428 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,612 $1,200 Implemented
WI0428 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,687 $0 Not Implemented
WI0428 # 05 Y:2002 05 2002 REDUCE VENTILATION AIR $2,242 $4,100 Not Implemented
WI0428 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,569 $1,000 Not Implemented
WI0428 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $849 $4,685 Not Implemented
WI0428 # 08 Y:2002 08 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $804 $2,000 Implemented
WI0428 # 09 Y:2002 09 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $802 $616 Not Implemented
OR0416 # 01 Y:2002 01 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $140,000 $790,000 Not Implemented
OR0416 # 02 Y:2002 02 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $19,366 $0 Not Implemented