IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0187 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,370 $6,500 Not Implemented
DL0187 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,400 $9,500 Not Implemented
DL0187 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,324 $119,348 Not Implemented
DL0187 # 09 Y:2021 09 2021 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $797 $4,000 Not Implemented
DL0187 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,153 $1,574 Implemented
WV0602 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,049 $3,000 Implemented
WV0602 # 02 Y:2020 02 2020 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,212 $8,168 Not Implemented
WV0602 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,669 $2,886 Implemented
WV0602 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $1,512 $2,197 Implemented
WV0602 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $743 $1,348 Not Implemented
WV0602 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $322 $299 Not Implemented
WV0602 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $268 $1,225 Implemented
WV0602 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $263 $1,060 Implemented
WV0602 # 09 Y:2020 09 2020 DEVELOP A REPAIR/REPLACE POLICY $154 $568 Implemented
WV0602 # 10 Y:2020 10 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $136 $570 Implemented
DL0182 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,910 $0 Implemented
DL0182 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,900 $25,200 Implemented
DL0182 # 03 Y:2020 03 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,280 $9,306 Not Implemented
DL0182 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $4,920 $60 Not Implemented
DL0182 # 05 Y:2020 05 2020 REDUCE VENTILATION AIR $290 $0 Not Implemented
DL0182 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,140 $2,150 Not Implemented
DL0182 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,320 $1,000 Not Implemented
DL0182 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $349 $1,440 Not Implemented
DL0182 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $879 Implemented
DL0182 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,845 $1,900 Not Implemented