Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0335 # 04 Y:1998 | 04 | 1998 | OPTIMIZE PLANT POWER FACTOR | $930 | $2,585 | Not Implemented |
AM0335 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $100 | Implemented |
AM0335 # 06 Y:1998 | 06 | 1998 | OPTIMIZE PLANT POWER FACTOR | $525 | $1,525 | Not Implemented |
AM0335 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $470 | $0 | Implemented |
AM0335 # 08 Y:1998 | 08 | 1998 | INSTALL SKYLIGHTS | $370 | $850 | Not Implemented |
AM0335 # 09 Y:1998 | 09 | 1998 | INSTALL SKYLIGHTS | $250 | $845 | Not Implemented |
AM0335 # 10 Y:1998 | 10 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $180 | $100 | Implemented |
AM0334 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $18,200 | $22,300 | Implemented |
AM0334 # 02 Y:1998 | 02 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $11,680 | $40,600 | Not Implemented |
AM0334 # 03 Y:1998 | 03 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,900 | $0 | Implemented |
AM0334 # 04 Y:1998 | 04 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,000 | $0 | Not Implemented |
AM0334 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,300 | $1,000 | Implemented |
AM0334 # 06 Y:1998 | 06 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,070 | $35 | Implemented |
AM0334 # 07 Y:1998 | 07 | 1998 | CONVERT TO AQUEOUS CLEANING SYSTEM | $1,260 | $1,030 | Implemented |
AM0334 # 08 Y:1998 | 08 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $165 | $340 | Not Implemented |
AM0334 # 09 Y:1998 | 09 | 1998 | USE A RAG RECYCLE SERVICE | $310 | $0 | Implemented |
AM0334 # 10 Y:1998 | 10 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $300 | $0 | Implemented |
AM0334 # 11 Y:1998 | 11 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $220 | $0 | Implemented |
AM0332 # 01 Y:1998 | 01 | 1998 | METER WASTE WATER | $7,230 | $8,500 | Implemented |
AM0332 # 02 Y:1998 | 02 | 1998 | REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS | $6,620 | $16,675 | Implemented |
AM0332 # 03 Y:1998 | 03 | 1998 | USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) | $2,605 | $3,090 | Not Implemented |
AM0332 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,700 | $2,665 | Implemented |
AM0332 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $830 | $100 | Not Implemented |
AM0332 # 06 Y:1998 | 06 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $775 | $1,200 | Implemented |
AM0332 # 07 Y:1998 | 07 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $460 | $0 | Implemented |