IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0314 # 04 Y:2009 04 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,010 $1,350 Implemented
LL0314 # 05 Y:2009 05 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,851 $840 Not Implemented
LL0314 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $770 Implemented
LL0314 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $520 $775 Not Implemented
LL0314 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $291 $180 Not Implemented
LL0314 # 09 Y:2009 09 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $381 $120 Not Implemented
OK0770 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,297 $0 Implemented
OK0770 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,597 $0 Implemented
OK0770 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $669 $1,056 Implemented
OK0770 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $8,014 $5,534 Not Implemented
OK0770 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,686 $17,885 Implemented
OK0770 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,894 $1,346 Not Implemented
OK0770 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $16,527 $0 Implemented
TT0030 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99,250 $272,800 Not Implemented
TT0030 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,650 $2,900 Not Implemented
TT0030 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $4,100 $22,600 Not Implemented
LL0304 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,266 $14,840 Implemented
LL0304 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,876 $20,949 Not Implemented
LL0304 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $9,892 $1,118 Not Implemented
LL0304 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,714 $30 Not Implemented
LL0304 # 05 Y:2008 05 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,456 $825 Not Implemented
LL0304 # 06 Y:2008 06 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $823 $1,246 Not Implemented
LL0304 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $70 Implemented
LL0301 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $230,177 $13,140 Implemented
LL0301 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $86,230 $9,006 Implemented