IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0153 # 07 Y:2019 07 2019 ADJUST BURNERS FOR EFFICIENT OPERATION $1,444 $400 Implemented
UU0150 # 01 Y:2019 01 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $20,467 $29,138 Implemented
UU0150 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,018 $6,202 Implemented
UU0150 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,551 $23,008 Not Implemented
UU0150 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,605 $15,000 Not Implemented
UU0150 # 05 Y:2019 05 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,756 $21,565 Not Implemented
UU0150 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,042 $5,250 Implemented
UU0150 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,861 $0 Implemented
UU0150 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,762 $3,762 Not Implemented
UU0150 # 09 Y:2019 09 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,385 $3,385 Not Implemented
UU0150 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,768 $1,756 Implemented
UU0150 # 11 Y:2019 11 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,570 $1,000 Implemented
UU0150 # 12 Y:2019 12 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,157 $950 Not Implemented
UU0150 # 13 Y:2019 13 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $921 $1,440 Not Implemented
UU0152 # 01 Y:2019 01 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $33,354 $66,174 Not Implemented
UU0152 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $12,915 $9,000 Implemented
UU0152 # 03 Y:2019 03 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,938 $2,000 Implemented
UU0152 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,593 $32,661 Implemented
UU0152 # 05 Y:2019 05 2019 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,562 $4,000 Not Implemented
UU0152 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,817 $3,415 Implemented
UU0152 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,480 $3,445 Not Implemented
UU0152 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,208 $231 Implemented
UU0151 # 01 Y:2019 01 2019 OPERATE BOILERS ON HIGH FIRE SETTING $63,057 $1,000 Not Implemented
UU0151 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $17,315 $25,000 Not Implemented
UU0151 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,711 $37,970 Not Implemented