IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0357 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,523 $1,359 Implemented
UM0357 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $1,466 $4,692 Implemented
UM0357 # 07 Y:2009 07 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,875 $7,500 Implemented
GT0868 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,075 $19,000 Not Implemented
GT0868 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,414 $3,000 Not Implemented
GT0868 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,079 $12,000 Not Implemented
GT0868 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,232 $60,000 Implemented
GT0868 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $4,676 Implemented
GT0868 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,368 $4,750 Implemented
SF0378 # 01 Y:2009 01 2009 ADJUST VENTS TO MINIMIZE ENERGY USE $4,936 $0 Not Implemented
SF0378 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,697 $0 Implemented
SF0378 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,063 $500 Implemented
SF0378 # 04 Y:2009 04 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $396 $75 Not Implemented
SF0378 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,409 $12,868 Not Implemented
SF0378 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $13,576 $17,518 Not Implemented
SF0378 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $840 Not Implemented
SF0378 # 08 Y:2009 08 2009 USE PHOTOCELL CONTROLS $771 $1,925 Not Implemented
DL0042 # 01 Y:2009 01 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,756 $0 Implemented
DL0042 # 02 Y:2009 02 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,180 $19,200 Not Implemented
DL0042 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,200 $1,760 Implemented
DL0042 # 04 Y:2009 04 2009 ADD AREA LIGHTING SWITCHES $11,009 $1,325 Not Implemented
DL0042 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,332 $368 Not Implemented
DL0042 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $982 $500 Not Implemented
DL0042 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,600 $36,600 Not Implemented
DL0042 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,400 $41,000 Not Implemented