Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27,123
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0680 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,835 | $33,120 | n/a |
WV0680 # 03 Y:2025 | 03 | 2025 | REDUCE VENTILATION AIR | $13,841 | $6,504 | n/a |
WV0680 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $19,535 | $2,495 | n/a |
WV0680 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,035 | $115,528 | n/a |
MZ1014 # 01 Y:2025 | 01 | 2025 | INSULATE BARE EQUIPMENT | $2,794 | $5,642 | n/a |
MZ1014 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,333 | $125,000 | n/a |
MZ1014 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO HEAT WATER | $3,721 | $34,860 | n/a |
MZ1014 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $412 | $950 | n/a |
MZ1014 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,690 | $3,100 | n/a |
MZ1014 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,398 | $146,247 | n/a |
NT0042 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,093 | $2,408 | n/a |
NT0042 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $146 | $142 | n/a |
NT0042 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,317 | $5,609 | n/a |
NT0042 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $28,561 | $0 | n/a |
NT0042 # 05 Y:2025 | 05 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,625 | $603 | n/a |
NT0042 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,525 | $5,000 | n/a |
IP0209 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,808 | $0 | n/a |
IP0209 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $4,072 | $0 | n/a |
IP0209 # 03 Y:2025 | 03 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $910 | $0 | n/a |
IP0209 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $336 | $0 | n/a |
IP0209 # 05 Y:2025 | 05 | 2025 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,829 | $238 | n/a |
IP0209 # 06 Y:2025 | 06 | 2025 | INSTALL AUTOMATIC STACK DAMPER | $9,546 | $1,395 | n/a |
IP0209 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,200 | $1,306 | n/a |
AM0954 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,650 | $16,569 | n/a |
AM0954 # 02 Y:2025 | 02 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $804 | $18,751 | n/a |