Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,746
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0002 # 01 Y:1984 | 01 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $306 | $0 | Implemented |
ST0002 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,941 | $40 | Implemented |
ST0002 # 03 Y:1984 | 03 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $845 | $80 | Implemented |
ST0002 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,150 | $310 | Implemented |
ST0002 # 05 Y:1984 | 05 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $386 | $182 | Not Implemented |
ST0002 # 06 Y:1984 | 06 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $450 | $537 | Implemented |
ST0002 # 07 Y:1984 | 07 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $584 | $420 | Implemented |
ST0002 # 08 Y:1984 | 08 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,455 | $1,800 | Implemented |
ST0002 # 09 Y:1984 | 09 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $564 | $282 | Not Implemented |
ST0002 # 10 Y:1984 | 10 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $296 | $0 | Implemented |
ST0002 # 11 Y:1984 | 11 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $147 | $370 | Implemented |
ST0002 # 12 Y:1984 | 12 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,070 | $0 | Implemented |
ST0003 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,925 | $372 | Implemented |
ST0003 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,227 | $24 | Implemented |
ST0003 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,017 | $537 | Implemented |
ST0003 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $786 | $2,035 | Implemented |
ST0003 # 05 Y:1984 | 05 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $156 | $0 | Implemented |
ST0003 # 06 Y:1984 | 06 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,004 | $940 | Implemented |
ST0003 # 07 Y:1984 | 07 | 1984 | INSTALL STORM WINDOWS AND DOORS | $668 | $209 | Not Implemented |
ST0003 # 08 Y:1984 | 08 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $447 | $0 | Not Implemented |
ST0003 # 09 Y:1984 | 09 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $681 | $436 | Implemented |
KU0131 # 01 Y:1984 | 01 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $15,513 | $17,900 | Not Implemented |
KU0131 # 02 Y:1984 | 02 | 1984 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,554 | $18,500 | Not Implemented |
KU0131 # 03 Y:1984 | 03 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,281 | $200 | Implemented |
KU0131 # 04 Y:1984 | 04 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,270 | $235 | Not Implemented |