IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0253 # 06 Y:1995 06 1995 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $727 $95 Implemented
HO0117 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,238 $2,300 Implemented
HO0117 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,814 $7,694 Implemented
HO0117 # 03 Y:1995 03 1995 KEEP BOILER TUBES CLEAN $5,227 $220 Implemented
HO0117 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $383 $513 Not Implemented
HO0117 # 05 Y:1995 05 1995 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,237 $500 Not Implemented
HO0117 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,328 $250 Implemented
HO0117 # 07 Y:1995 07 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,610 $4,000 Not Implemented
NV0042 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,185 $1,514 Implemented
NV0042 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $852 $0 Implemented
NV0042 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $550 Implemented
NV0042 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $159 $110 Not Implemented
NV0042 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $324 $491 Not Implemented
NV0042 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $884 $7,500 Not Implemented
NV0042 # 07 Y:1995 07 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $666 $0 Implemented
MA0349 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $47,119 $20,700 Implemented
MA0349 # 02 Y:1995 02 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $25,737 $27,186 Not Implemented
MA0349 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $858 $1,700 Implemented
MA0349 # 04 Y:1995 04 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $777 $2,600 Not Implemented
MA0349 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $127 Not Implemented
OR0253 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $29,097 $26,200 Not Implemented
OR0253 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,790 $5,000 Not Implemented
OR0253 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,142 $0 Not Implemented
OR0253 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,009 $2,543 Not Implemented
OR0253 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,570 $35,000 Not Implemented