Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0253 # 06 Y:1995 | 06 | 1995 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $727 | $95 | Implemented |
HO0117 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,238 | $2,300 | Implemented |
HO0117 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,814 | $7,694 | Implemented |
HO0117 # 03 Y:1995 | 03 | 1995 | KEEP BOILER TUBES CLEAN | $5,227 | $220 | Implemented |
HO0117 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $383 | $513 | Not Implemented |
HO0117 # 05 Y:1995 | 05 | 1995 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,237 | $500 | Not Implemented |
HO0117 # 06 Y:1995 | 06 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,328 | $250 | Implemented |
HO0117 # 07 Y:1995 | 07 | 1995 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $5,610 | $4,000 | Not Implemented |
NV0042 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,185 | $1,514 | Implemented |
NV0042 # 02 Y:1995 | 02 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $852 | $0 | Implemented |
NV0042 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,310 | $550 | Implemented |
NV0042 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $159 | $110 | Not Implemented |
NV0042 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $324 | $491 | Not Implemented |
NV0042 # 06 Y:1995 | 06 | 1995 | OPTIMIZE PLANT POWER FACTOR | $884 | $7,500 | Not Implemented |
NV0042 # 07 Y:1995 | 07 | 1995 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $666 | $0 | Implemented |
MO0161 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,126 | $2,024 | Implemented |
MO0161 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $997 | $682 | Implemented |
MO0161 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $122 | $0 | Implemented |
MO0161 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,649 | $15,514 | Implemented |
MO0161 # 05 Y:1995 | 05 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $180 | $0 | Implemented |
MO0161 # 06 Y:1995 | 06 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $771 | $642 | Not Implemented |
MO0161 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,440 | $306 | Implemented |
MO0161 # 08 Y:1995 | 08 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,805 | $5,000 | Implemented |
MO0161 # 09 Y:1995 | 09 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,018 | $11,160 | Implemented |
MA0349 # 01 Y:1995 | 01 | 1995 | INSULATE BARE EQUIPMENT | $47,119 | $20,700 | Implemented |