Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0488 # 07 Y:2012 | 07 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,208 | $554 | Not Implemented |
IA0488 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,279 | $7,090 | Not Implemented |
IA0488 # 09 Y:2012 | 09 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,676 | $7,150 | Not Implemented |
IA0488 # 10 Y:2012 | 10 | 2012 | AIR CONDITION ONLY SPACE NECESSARY | $1,073 | $70 | Not Implemented |
IA0488 # 11 Y:2012 | 11 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,909 | $743 | Not Implemented |
TT0099 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,046 | $1,000 | Implemented |
TT0099 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,777 | $980 | Implemented |
TT0099 # 03 Y:2012 | 03 | 2012 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $9,303 | $10,800 | Implemented |
NC0469 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,713 | $129,851 | Implemented |
NC0469 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $389 | $1,595 | Implemented |
NC0469 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $769 | $1,200 | Not Implemented |
NC0469 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $784 | $843 | Implemented |
NC0469 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $934 | $200 | Implemented |
NC0469 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,526 | $0 | Implemented |
NC0469 # 07 Y:2012 | 07 | 2012 | REDESIGN PROCESS | $12,445 | $25,000 | Not Implemented |
NC0469 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $288 | $860 | Implemented |
DL0094 # 01 Y:2012 | 01 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,550 | $0 | Implemented |
DL0094 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,797 | $12,000 | Not Implemented |
DL0094 # 03 Y:2012 | 03 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,058 | $1,450 | Not Implemented |
DL0094 # 04 Y:2012 | 04 | 2012 | AIR CONDITION ONLY SPACE NECESSARY | $780 | $0 | Implemented |
DL0094 # 05 Y:2012 | 05 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $384 | $0 | Not Implemented |
DL0094 # 06 Y:2012 | 06 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,392 | $7,320 | Not Implemented |
DL0094 # 07 Y:2012 | 07 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $570 | $10 | Not Implemented |
BS0008 # 01 Y:2012 | 01 | 2012 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $9,360 | $350 | Not Implemented |
BS0008 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,298 | $14,400 | Not Implemented |