IAC logo
IAC Assessment: NC0469
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0469
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Upholstered furniture
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 2512 - Upholstered Household Furniture
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 454,422
Annual Production 36,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,042 1,756,770 kWh $0.06
Electricity Demand $34,708 8,817 kW-months/year $3.94
Natural Gas $6,778 819 MMBtu $8.28
Wood $1 4,500 MMBtu $0.00
TOTAL ENERGY COSTS $152,529
RECOMMENDED SAVINGS* $39,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,634
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,713
Cost:
$129,851
$16,349 258,684 $6,364 1,552 - - $16,349
258,684
kWh
$6,364
1,552
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$389
Cost:
$1,595
$187 2,958 $73 18 $129 - $187
2,958
kWh
$73
18
kW-months/year
$129
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$769
Cost:
$1,200
$769 12,169 - - - - $769
12,169
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$784
Cost:
$843
$320 5,070 $29 7 $435 - $320
5,070
kWh
$29
7
kW-months/year
$435
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$934
Cost:
$200
$680 10,760 $254 62 - - $680
10,760
kWh
$254
62
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,526
Cost:
-
$1,098 17,380 $428 104 - - $1,098
17,380
kWh
$428
104
kW-months/year
-
-
$
07: 2.5194 REDESIGN PROCESS Savings:
$12,445
Cost:
$25,000
$8,958 141,740 $3,487 850 - - $8,958
141,740
kWh
$3,487
850
kW-months/year
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$288
Cost:
$860
$207 3,280 $81 20 - - $207
3,280
kWh
$81
20
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$39,848
Cost:
$159,549
$28,568 452,041 $10,716 2,613 $564 - $28,568
452,041
kWh
$10,716
2,613
kW-months/year
$564
-
$
TOTAL IMPLEMENTED Savings:
$26,634
Cost:
$133,349
$18,841 298,132 $7,229 1,763 $564 - $18,841
298,132
kWh
$7,229
1,763
kW-months/year
$564
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost