IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0292 # 04 Y:1997 04 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $276 $0 Not Implemented
KG0082 # 01 Y:1997 01 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,336 $250 n/a
KG0082 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,010 $14,000 n/a
KG0082 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,669 $604 n/a
KG0082 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,210 $2,650 n/a
KG0082 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $823 $600 n/a
KG0082 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,960 $0 n/a
KG0082 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,525 $0 n/a
KG0082 # 08 Y:1997 08 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,174 $1,079 n/a
KG0082 # 09 Y:1997 09 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $38,025 $0 n/a
AM0291 # 01 Y:1997 01 1997 RECOVER AND REUSE COOLING WATER $7,000 $4,100 Implemented
AM0291 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $3,100 $5,630 Implemented
AM0291 # 03 Y:1997 03 1997 ADD AREA LIGHTING SWITCHES $2,150 $1,290 Not Implemented
AM0291 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,100 $2,500 Implemented
AM0291 # 05 Y:1997 05 1997 REPAIR AND ELIMINATE STEAM LEAKS $1,980 $210 Implemented
AM0291 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,860 $780 Implemented
AM0291 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,060 $500 Implemented
AM0291 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $25 Implemented
AM0290 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $4,660 $920 Implemented
AM0290 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,310 $500 Implemented
AM0290 # 03 Y:1997 03 1997 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,100 $0 Implemented
AM0290 # 04 Y:1997 04 1997 USE SYNTHETIC LUBRICANT $2,130 $0 Implemented
AM0290 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $300 Implemented
AM0290 # 06 Y:1997 06 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,300 $150 Implemented
AM0290 # 07 Y:1997 07 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $750 $0 Not Implemented