Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0604 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $33,778 | $1,120 | Not Implemented |
SF0604 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $21,457 | $280 | Implemented |
SF0604 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,745 | $1,883 | Not Implemented |
SF0604 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $65,157 | $47,904 | Not Implemented |
SF0604 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,264 | $2,879 | Not Implemented |
SF0604 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $8,611 | Not Implemented |
SD0639 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,294 | $90,412 | Implemented |
SD0639 # 02 Y:2023 | 02 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $15,758 | $0 | Implemented |
SD0639 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,572 | $31,410 | Implemented |
SD0639 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,271 | $4,317 | Implemented |
SD0639 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,109 | $18,901 | Implemented |
SD0639 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,370 | $18,675 | Implemented |
SD0639 # 07 Y:2023 | 07 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $69,455 | $136,016 | Implemented |
SF0603 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,450 | $120 | Not Implemented |
SF0603 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,983 | $141 | Implemented |
SF0603 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,760 | $1,440 | Implemented |
SF0603 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,008 | $7,651 | Implemented |
SF0603 # 05 Y:2023 | 05 | 2023 | USE PHOTOCELL CONTROLS | $3,805 | $9,018 | Implemented |
SF0603 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,772 | $124,644 | Implemented |
SF0603 # 07 Y:2023 | 07 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $608 | $2,572 | Implemented |
SF0603 # 08 Y:2023 | 08 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $568,246 | $3,565,479 | Not Implemented |
SJ0005 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,218 | $962 | Implemented |
SJ0005 # 02 Y:2023 | 02 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $23,445 | $5,613 | Not Implemented |
SJ0005 # 03 Y:2023 | 03 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $270 | $0 | Not Implemented |
SJ0005 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,251 | $4,556 | Not Implemented |