IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0065 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $1,273 $800 Not Implemented
RU0065 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,488 $2,500 Not Implemented
RU0065 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $3,656 $0 Not Implemented
RU0066 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,758 $105,000 Implemented
RU0066 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,106 $102 Not Implemented
RU0066 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $3,064 $800 Not Implemented
RU0066 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $0 Implemented
RU0066 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,509 $0 Not Implemented
RU0066 # 06 Y:1989 06 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,609 $4,396 Not Implemented
RU0067 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $2,936 $240 Not Implemented
RU0067 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $164 Implemented
RU0067 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,152 $0 Implemented
RU0067 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $645 $49 Implemented
RU0067 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,637 $6,800 Not Implemented
RU0067 # 06 Y:1989 06 1989 RECOVER WASTE HEAT FROM EQUIPMENT $12,720 $53,500 Not Implemented
RU0067 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,844 $500 Implemented
RU0067 # 08 Y:1989 08 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,462 $5,460 Not Implemented
RU0068 # 01 Y:1989 01 1989 AIR CONDITION ONLY SPACE NECESSARY $5,037 $3,133 Not Implemented
RU0068 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,132 $0 Not Implemented
RU0068 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $548 $500 Implemented
RU0068 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,169 $1,912 Not Implemented
RU0069 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,570 $6,745 Not Implemented
RU0069 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,131 $700 Implemented
RU0069 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,084 $0 Implemented
RU0069 # 04 Y:1989 04 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,071 $0 Not Implemented