IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0242 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $307 $1,280 n/a
WI0242 # 03 Y:1995 03 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,143 $400 n/a
WI0242 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,120 $0 n/a
WI0242 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,079 $1,090 n/a
WI0242 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $1,080 n/a
WI0242 # 07 Y:1995 07 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $896 $725 n/a
WI0242 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,600 $8,500 n/a
WI0242 # 09 Y:1995 09 1995 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,050 $4,000 n/a
WI0241 # 01 Y:1995 01 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,790 $880 Not Implemented
WI0241 # 02 Y:1995 02 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,075 $3,720 Not Implemented
WI0241 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,028 $1,850 Implemented
WI0241 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $473 $210 Implemented
WI0241 # 05 Y:1995 05 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $208 $160 Not Implemented
WI0241 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $166 $75 Not Implemented
BD0031 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,441 $3,710 Not Implemented
BD0031 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,068 $420 Implemented
BD0031 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $346 Implemented
BD0031 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $529 $150 Not Implemented
BD0031 # 05 Y:1995 05 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $87 $20 Implemented
BD0031 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,936 $581 Not Implemented
BD0031 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,529 $10,500 Not Implemented
BD0031 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $600 Implemented
BD0033 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,652 $500 n/a
BD0033 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $400 n/a
BD0033 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,800 $180 n/a