IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0235 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,822 $0 Not Implemented
WI0235 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,337 $1,864 Not Implemented
WI0235 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $884 $0 Not Implemented
WI0235 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $388 $750 Not Implemented
WI0235 # 06 Y:1995 06 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,145 $200 Not Implemented
WI0235 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $505 $50 Not Implemented
WI0235 # 08 Y:1995 08 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $368 $875 Not Implemented
WI0235 # 09 Y:1995 09 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $121 $0 Not Implemented
WI0235 # 10 Y:1995 10 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,200 $0 Not Implemented
BD0023 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,980 $500 Implemented
BD0023 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $807 $600 Not Implemented
BD0023 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $1,215 $150 Not Implemented
BD0023 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $801 $20 Not Implemented
BD0023 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $6,380 Implemented
BD0023 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,132 $64 Not Implemented
BD0023 # 07 Y:1995 07 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $308 $0 Implemented
WI0233 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,847 $8,000 Implemented
WI0233 # 02 Y:1995 02 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,652 $12,000 Not Implemented
WI0233 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,790 $500 Implemented
WI0233 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,066 $1,860 Not Implemented
WI0233 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $550 $0 Implemented
WI0233 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $196 $0 Not Implemented
WI0233 # 07 Y:1995 07 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,470 $12,000 Not Implemented
WI0233 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,000 $0 Implemented
WI0228 # 01 Y:1995 01 1995 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $16,786 $30,000 Not Implemented