IAC Assessment: WI0243
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1995
Principal Product Wax for investment casting
NAICS n/a
SIC 2911 - Petroleum Refining
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 95,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 2,550
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,470 920,281 kWh $0.07
Natural Gas $75,669 21,812 MMBtu $3.47
TOTAL ENERGY COSTS $107,339
RECOMMENDED SAVINGS* $34,819 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,646
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ lb $ $
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$4,132
Cost:
$10,000
- - $4,132 1,191 - - - - -
-
kWh
$4,132
1,191
MMBtu
-
-
lb
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,975
Cost:
$400
- - $6,975 2,010 - - - - -
-
kWh
$6,975
2,010
MMBtu
-
-
lb
-
-
$
03: 2.1224 REPLACE BOILER Savings:
$3,712
Cost:
$12,000
- - $3,712 782 - - - - -
-
kWh
$3,712
782
MMBtu
-
-
lb
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,111
Cost:
$6,000
$2,635 35,463 $(-524) (-151) - - - - $2,635
35,463
kWh
$(-524)
(-151)
MMBtu
-
-
lb
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,773
Cost:
$1,500
$1,773 - - - - - - - $1,773
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,126
Cost:
$538
- - $1,126 325 - - - - -
-
kWh
$1,126
325
MMBtu
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$898
Cost:
$1,796
$898 12,016 - - - - - - $898
12,016
kWh
-
-
MMBtu
-
-
lb
-
-
$
08: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$445
Cost:
$700
$445 5,862 - - - - - - $445
5,862
kWh
-
-
MMBtu
-
-
lb
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$248
Cost:
$672
- - $248 72 - - - - -
-
kWh
$248
72
MMBtu
-
-
lb
-
-
$
10: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$13,399
Cost:
$9,000
- - $(-500) (-144) $17,019 30,000 $(-3,120) - -
-
kWh
$(-500)
(-144)
MMBtu
$17,019
30,000
lb
$(-3,120)
-
$
TOTAL RECOMMENDED Savings:
$34,819
Cost:
$42,606
$5,751 53,341 $15,169 4,085 $17,019 30,000 $(-3,120) - $5,751
53,341
kWh
$15,169
4,085
MMBtu
$17,019
30,000
lb
$(-3,120)
-
$
TOTAL IMPLEMENTED Savings:
$9,646
Cost:
$3,696
$2,671 12,016 $6,975 2,010 - - - - $2,671
12,016
kWh
$6,975
2,010
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes