Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,738
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0756 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,491 | $1,000 | Implemented |
OK0756 # 04 Y:2008 | 04 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,469 | $7,702 | Not Implemented |
OK0756 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $36,391 | $6,600 | Not Implemented |
OK0756 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $12,665 | $8,800 | Not Implemented |
OK0755 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,231 | $4,120 | Implemented |
OK0755 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $949 | $2,196 | Implemented |
OK0755 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $399 | $160 | Not Implemented |
OK0755 # 04 Y:2008 | 04 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $15 | $21 | Not Implemented |
OK0755 # 05 Y:2008 | 05 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,400 | $0 | Not Implemented |
OK0755 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,008 | $28,144 | Implemented |
OK0755 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $960 | $2,000 | Implemented |
OK0755 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $482 | $1,000 | Not Implemented |
OK0755 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $150 | Implemented |
OK0755 # 10 Y:2008 | 10 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,540 | $0 | Implemented |
OK0754 # 01 Y:2007 | 01 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,500 | $0 | Not Implemented |
OK0754 # 02 Y:2007 | 02 | 2007 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $13,115 | $1,600 | Not Implemented |
OK0754 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,872 | $1,000 | Not Implemented |
OK0754 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,351 | $4,638 | Implemented |
OK0754 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,311 | $814 | Implemented |
OK0754 # 06 Y:2007 | 06 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,226 | $113,794 | Not Implemented |
OK0754 # 07 Y:2007 | 07 | 2007 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $32,400 | $320 | Implemented |
OK0754 # 08 Y:2007 | 08 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $660 | $5,303 | Not Implemented |
OK0754 # 09 Y:2007 | 09 | 2007 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,086 | $0 | Implemented |
OK0752 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,323 | $2,319 | Not Implemented |
OK0752 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,360 | $0 | Not Implemented |