IAC Assessment: LL0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2008
Principal Product Tires
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales $50,000,000-$100,000,000
# of Employees 1,550
Plant Area (Sq.Ft.) 1,918,000
Annual Production 9,500,000 Pieces
Production Hrs. Annual 7,344
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $5,201,937 148,684,000 kWh $0.03
Electricity Demand $1,277,437 254,735 kW-months/year $5.01
Electricity Fees $258,457 - $ -
Natural Gas $4,091,142 590,191 MMBtu $6.93
TOTAL ENERGY COSTS $10,828,973
RECOMMENDED SAVINGS* $469,092 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $385,400
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$274,767
Cost:
$187,520
$264,199 7,550,692 - - $10,568 - - - - - $264,199
7,550,692
kWh
-
-
kW-months/year
$10,568
-
$
-
-
MMBtu
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$110,300
Cost:
$3,650
- - - - - - $110,300 15,918 - - -
-
kWh
-
-
kW-months/year
-
-
$
$110,300
15,918
MMBtu
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$47,583
Cost:
$1,290
- - - - - - $47,583 6,860 - - -
-
kWh
-
-
kW-months/year
-
-
$
$47,583
6,860
MMBtu
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$21,390
Cost:
$11,905
- - - - - - - - $21,390 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$21,390
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,830
Cost:
$1,940
- - - - - - $7,830 1,130 - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,830
1,130
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,497
Cost:
$3,500
$1,165 33,288 $240 48 $56 - - - $3,036 - $1,165
33,288
kWh
$240
48
kW-months/year
$56
-
$
-
-
MMBtu
$3,036
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,820
Cost:
$1,710
$1,119 31,980 $631 126 $70 - - - - - $1,119
31,980
kWh
$631
126
kW-months/year
$70
-
$
-
-
MMBtu
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$572
Cost:
$1,402
$550 15,725 - - $22 - - - - - $550
15,725
kWh
-
-
kW-months/year
$22
-
$
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$333
Cost:
$165
- - - - - - $333 48 - - -
-
kWh
-
-
kW-months/year
-
-
$
$333
48
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$469,092
Cost:
$213,082
$267,033 7,631,685 $871 174 $10,716 - $166,046 23,956 $24,426 - $267,033
7,631,685
kWh
$871
174
kW-months/year
$10,716
-
$
$166,046
23,956
MMBtu
$24,426
-
$
TOTAL IMPLEMENTED Savings:
$385,400
Cost:
$191,335
$264,199 7,550,692 - - $10,568 - $110,633 15,966 - - $264,199
7,550,692
kWh
-
-
kW-months/year
$10,568
-
$
$110,633
15,966
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes