IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0069 # 05 Y:1989 05 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,985 $2,500 Not Implemented
RU0070 # 01 Y:1989 01 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,495 $51,000 Not Implemented
RU0070 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,082 $0 Not Implemented
RU0070 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $971 $332 Implemented
RU0070 # 04 Y:1989 04 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $16,973 $56,000 Not Implemented
RU0070 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $12,730 $3,000 Implemented
RU0063 # 01 Y:1989 01 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,103 $0 Implemented
RU0063 # 02 Y:1989 02 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,025 $0 Not Implemented
RU0063 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,741 $6,626 Implemented
RU0063 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,318 $0 Implemented
RU0063 # 05 Y:1989 05 1989 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $3,381 $0 Implemented
RU0063 # 06 Y:1989 06 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $989 $2,000 Implemented
RU0063 # 07 Y:1989 07 1989 USE OPTIMUM THICKNESS INSULATION $856 $400 Implemented
RU0063 # 08 Y:1989 08 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $342 $81 Implemented
WI0063 # 01 Y:1989 01 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,384 $0 Implemented
WI0063 # 02 Y:1989 02 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $8,040 $15,000 Not Implemented
WI0063 # 03 Y:1989 03 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,768 $1,750 Implemented
WI0063 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,284 $1,040 Implemented
WI0063 # 05 Y:1989 05 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,658 $4,000 Implemented
WI0063 # 06 Y:1989 06 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,822 $5,000 Not Implemented
WI0063 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $1,043 Implemented
WI0063 # 08 Y:1989 08 1989 IMPROVE LUBRICATION PRACTICES $1,606 $0 Not Implemented
WI0063 # 09 Y:1989 09 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,100 $2,000 Not Implemented
WI0063 # 10 Y:1989 10 1989 INSTALL SET-BACK TIMERS $929 $400 Not Implemented
WI0063 # 11 Y:1989 11 1989 RECOVER WASTE HEAT FROM EQUIPMENT $740 $1,000 Not Implemented