IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0011 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,069 $607 Implemented
KG0011 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $310 $420 Implemented
KG0011 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $172 $130 Not Implemented
NC0041 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,492 $300 Implemented
NC0041 # 02 Y:1994 02 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,252 $15,600 Implemented
NC0041 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,145 $926 Not Implemented
NC0041 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $14,685 Implemented
NC0041 # 05 Y:1994 05 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,282 $500 Not Implemented
NC0041 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $2,000 Implemented
NC0041 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $725 $1,060 Implemented
ND0197 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,102 $3,900 Implemented
ND0197 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,959 $25,920 Implemented
ND0197 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $3,537 $800 Not Implemented
ND0197 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,719 $2,179 Implemented
ND0197 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $1,850 Implemented
ND0197 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $1,330 Not Implemented
WI0223 # 01 Y:1994 01 1994 REPLACE BOILER $3,696 $6,500 Not Implemented
WI0223 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,412 $2,989 Not Implemented
WI0223 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $228 $225 Not Implemented
WI0223 # 04 Y:1994 04 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,910 $0 Implemented
WI0223 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $816 $0 Implemented
WI0223 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $640 Not Implemented
IA0099 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $535 $0 Not Implemented
IA0099 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $22,684 $0 Implemented
IA0099 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $11,414 $1,400 Implemented