Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0144 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $586 | $0 | Not Implemented |
SU0144 # 07 Y:2002 | 07 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $326 | $0 | Implemented |
SU0144 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $255 | $75 | Implemented |
SU0144 # 09 Y:2002 | 09 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $252 | $40 | Not Implemented |
WV0254 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $755 | $600 | Implemented |
WV0254 # 07 Y:2002 | 07 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,833 | $1,000 | Implemented |
WV0254 # 08 Y:2002 | 08 | 2002 | INSULATE BARE EQUIPMENT | $1,756 | $483 | Implemented |
WV0254 # 09 Y:2002 | 09 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,809 | $600 | Implemented |
WV0254 # 10 Y:2002 | 10 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,987 | $300 | Implemented |
WV0254 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,240 | $0 | Implemented |
WV0254 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,039 | $3,154 | Implemented |
WV0254 # 13 Y:2002 | 13 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,844 | $4,000 | Not Implemented |
WV0254 # 14 Y:2002 | 14 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,200 | $100 | Implemented |
WV0254 # 15 Y:2002 | 15 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $14,000 | $6,000 | Not Implemented |
WV0254 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,829 | $420 | Not Implemented |
WV0254 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,033 | $120 | Implemented |
WV0254 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,900 | $460 | Not Implemented |
WV0254 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,421 | $1,200 | Not Implemented |
WV0254 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,172 | $200 | Implemented |
IA0303 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $863 | $162 | Implemented |
IA0303 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $404 | $130 | Not Implemented |
IA0303 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $246 | $15 | Not Implemented |
IA0303 # 04 Y:2002 | 04 | 2002 | INSTALL BACK-UP EQUIPMENT | $5,666 | $9,824 | Implemented |
IA0303 # 05 Y:2002 | 05 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $711 | $1,800 | Not Implemented |
IA0303 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,059 | $10,890 | Not Implemented |