IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0125 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,042 $1,525 Not Implemented
WM0125 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $791 $1,806 Not Implemented
WM0125 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $293 $0 Implemented
WM0125 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $360 Not Implemented
WM0125 # 09 Y:2018 09 2018 INSTALL OCCUPANCY SENSORS $200 $855 Not Implemented
WM0125 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $86 $136 Not Implemented
WM0125 # 11 Y:2018 11 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $71 $0 Not Implemented
UA0198 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,573 $13,202 Implemented
UA0198 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,127 $1,410 Not Implemented
UA0198 # 03 Y:2018 03 2018 INSTALL TIMERS AND/OR THERMOSTATS $6,436 $50 Implemented
UA0198 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $2,992 $180 Implemented
UU0136 # 01 Y:2018 01 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $159,197 $1,737,000 Not Implemented
UU0136 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,936 $17,716 Implemented
UU0136 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,124 $0 Not Implemented
UU0136 # 04 Y:2018 04 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $5,731 $1,000 Not Implemented
UU0136 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $4,948 $420 Implemented
UU0136 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $2,075 $0 Implemented
UU0136 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,814 $600 Implemented
UU0136 # 08 Y:2018 08 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,192 $1,000 Not Implemented
MA0790 # 01 Y:2018 01 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $207,219 $1,000,000 Not Implemented
MA0790 # 02 Y:2018 02 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $48,698 $124,000 Implemented
MA0790 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,345 $33,774 Implemented
MA0790 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,380 $500 Implemented
MA0790 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,372 $5,831 Implemented
MA0790 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,658 $25,350 Implemented