IAC Assessment: MA0790
IAC Center University of Massachusetts
Assessment Year 2018
Principal Product Water treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 51
Plant Area (Sq.Ft.) 100,000
Annual Production 8,370,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,266,846 13,728,918 kWh $0.09
Electricity Demand $435,058 24,791 kW-months/year $17.55
Electricity Fees $26,400 - $ -
Natural Gas $78,730 9,943 MMBtu $7.92
TOTAL ENERGY COSTS $1,807,034
RECOMMENDED SAVINGS* $329,708 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $116,387
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$207,219
Cost:
$1,000,000
- - $207,219 11,808 - - -
-
kWh
$207,219
11,808
kW-months/year
-
-
MMBtu
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$48,698
Cost:
$124,000
$48,698 529,331 - - - - $48,698
529,331
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,345
Cost:
$33,774
$12,254 133,197 $12,091 689 - - $12,254
133,197
kWh
$12,091
689
kW-months/year
-
-
MMBtu
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$19,380
Cost:
$500
$19,380 210,652 - - - - $19,380
210,652
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,372
Cost:
$5,831
$8,058 87,588 - - $7,314 1,497 $8,058
87,588
kWh
-
-
kW-months/year
$7,314
1,497
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,658
Cost:
$25,350
$6,658 72,366 - - - - $6,658
72,366
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,286
Cost:
$100
$3,286 35,716 $1,000 57 - - $3,286
35,716
kWh
$1,000
57
kW-months/year
-
-
MMBtu
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,934
Cost:
$6,774
$1,934 21,024 - - - - $1,934
21,024
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,816
Cost:
$4,785
$1,816 19,736 - - - - $1,816
19,736
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$329,708
Cost:
$1,201,114
$102,084 1,109,610 $220,310 12,554 $7,314 1,497 $102,084
1,109,610
kWh
$220,310
12,554
kW-months/year
$7,314
1,497
MMBtu
TOTAL IMPLEMENTED Savings:
$116,387
Cost:
$196,229
$96,982 1,054,158 $12,091 689 $7,314 1,497 $96,982
1,054,158
kWh
$12,091
689
kW-months/year
$7,314
1,497
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas