IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0232 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $192,386 $82,242 Not Implemented
UF0232 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,006 $60 Implemented
UF0232 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,521 $1,500 Implemented
UF0232 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,539 $834 Implemented
UF0232 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,215 $0 Implemented
UF0231 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,328 $4,141 Not Implemented
UF0231 # 02 Y:1999 02 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,140 $2,650 Not Implemented
UF0231 # 03 Y:1999 03 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,596 $450 Implemented
UF0231 # 04 Y:1999 04 1999 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $12,394 $42,085 Not Implemented
UF0231 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,198 $1,000 Implemented
UF0231 # 06 Y:1999 06 1999 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $62,712 $2,200 Not Implemented
UF0231 # 07 Y:1999 07 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,200 $0 Implemented
UF0231 # 08 Y:1999 08 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,562 $0 Implemented
UF0230 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,804 $8,987 Not Implemented
UF0230 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,142 $2,240 Not Implemented
UF0230 # 01 Y:1999 01 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,087 $50 Implemented
UF0230 # 04 Y:1999 04 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,916 $0 Not Implemented
UF0230 # 05 Y:1999 05 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $198 $280 Not Implemented
UF0228 # 06 Y:1999 06 1999 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $57,600 $1,090,000 Implemented
UF0228 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,851 $0 Not Implemented
UF0228 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,958 $0 Not Implemented
UF0228 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,888 $50 Implemented
UF0228 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,660 $955 Not Implemented
UF0228 # 05 Y:1999 05 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $274,473 $22,390 Not Implemented
UF0226 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,196 $0 Not Implemented