Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,908
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0328 # 05 Y:2025 | 05 | 2025 | USE EXISTING DAM TO GENERATE ELECTRICITY | $6,679 | $33,300 | n/a |
IC0328 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $244 | $694 | n/a |
IC0328 # 03 Y:2025 | 03 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $239 | $0 | n/a |
IC0328 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $82,241 | $385,393 | n/a |
IC0328 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $101,072 | $435,474 | n/a |
IP0214 # 14 Y:2025 | 14 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,911 | $51,915 | n/a |
IP0214 # 13 Y:2025 | 13 | 2025 | REPLACE BOILER | $29,619 | $95,000 | n/a |
IP0214 # 01 Y:2025 | 01 | 2025 | CONVERT TO ELECTROSTATIC POWDER COATING | $114,298 | $0 | n/a |
IP0214 # 02 Y:2025 | 02 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $2,655 | $0 | n/a |
IP0214 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,561 | $243 | n/a |
IP0214 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,034 | $3,500 | n/a |
IP0214 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,935 | $2,485 | n/a |
IP0214 # 06 Y:2025 | 06 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,932 | $646 | n/a |
IP0214 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $562,500 | $561,997 | n/a |
IP0214 # 08 Y:2025 | 08 | 2025 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $9,428 | $9,599 | n/a |
IP0214 # 09 Y:2025 | 09 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $9,756 | $12,559 | n/a |
IP0214 # 10 Y:2025 | 10 | 2025 | UPGRADE CONVEYORS | $4,792 | $7,500 | n/a |
IP0214 # 11 Y:2025 | 11 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,076 | $3,485 | n/a |
IP0214 # 12 Y:2025 | 12 | 2025 | STANDARDIZE MOTOR INVENTORY | $23,673 | $53,888 | n/a |
IP0211 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,011 | $0 | n/a |
IP0211 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,506 | $0 | n/a |
IP0211 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $820 | $0 | n/a |
IP0211 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,109 | $25 | n/a |
IP0211 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,605 | $573 | n/a |
IP0211 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $1,149 | $361 | n/a |