IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0815 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,229 $69,592 Implemented
GT0815 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,456 $39,000 Implemented
UM0294 # 01 Y:2005 01 2005 COVER OPEN TANKS $48,559 $7,232 Not Implemented
UM0294 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,274 $600 Not Implemented
UM0294 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,684 $4,536 Not Implemented
UM0294 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,051 $2,400 Not Implemented
UM0294 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,604 $3,000 Not Implemented
UM0294 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,231 $1,344 Not Implemented
TA0111 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $2,750 $5,500 Not Implemented
TA0111 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,913 $400 Not Implemented
TA0111 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $44,045 $20,000 Not Implemented
TA0111 # 02 Y:2005 02 2005 AIR CONDITION ONLY SPACE NECESSARY $51,150 $0 Not Implemented
TA0111 # 01 Y:2005 01 2005 CLEAR AND RENT EXISTING SPACE $225,000 $2,250 Not Implemented
OR0494 # 15 Y:2005 15 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $7,580 $19,700 Not Implemented
OR0494 # 14 Y:2005 14 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $107,700 $340,000 Implemented
OR0494 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,800 $49,400 Implemented
OR0494 # 12 Y:2005 12 2005 UPGRADE OBSOLETE EQUIPMENT $1,100 $1,300 Not Implemented
OR0494 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,400 $6,500 Implemented
OR0494 # 10 Y:2005 10 2005 UPGRADE CONTROLS ON COMPRESSORS $3,500 $2,320 Not Implemented
OR0494 # 09 Y:2005 09 2005 REDUCE FLUID FLOW RATES $2,400 $0 Implemented
OR0494 # 08 Y:2005 08 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,100 $0 Implemented
OR0494 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,400 $0 Implemented
OR0494 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $0 Implemented
OR0494 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $55,000 $3,100 Implemented
OR0494 # 04 Y:2005 04 2005 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $36,800 $1,400 Not Implemented