Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94,135
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0815 # 02 Y:2005 | 02 | 2005 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $84,900 | $37,500 | Not Implemented |
GT0815 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $116,700 | $90,000 | Not Implemented |
UM0294 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $1,231 | $1,344 | Not Implemented |
UM0294 # 05 Y:2005 | 05 | 2005 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,604 | $3,000 | Not Implemented |
UM0294 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,051 | $2,400 | Not Implemented |
UM0294 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,684 | $4,536 | Not Implemented |
UM0294 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,274 | $600 | Not Implemented |
UM0294 # 01 Y:2005 | 01 | 2005 | COVER OPEN TANKS | $48,559 | $7,232 | Not Implemented |
TA0111 # 07 Y:2005 | 07 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,370 | $10 | Not Implemented |
TA0111 # 06 Y:2005 | 06 | 2005 | DISCONNECT BALLASTS | $1,660 | $140 | Not Implemented |
TA0111 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $2,750 | $5,500 | Not Implemented |
TA0111 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,913 | $400 | Not Implemented |
TA0111 # 03 Y:2005 | 03 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,045 | $20,000 | Not Implemented |
TA0111 # 02 Y:2005 | 02 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $51,150 | $0 | Not Implemented |
TA0111 # 01 Y:2005 | 01 | 2005 | CLEAR AND RENT EXISTING SPACE | $225,000 | $2,250 | Not Implemented |
OR0494 # 15 Y:2005 | 15 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,580 | $19,700 | Not Implemented |
OR0494 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,400 | $6,500 | Implemented |
OR0494 # 10 Y:2005 | 10 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,500 | $2,320 | Not Implemented |
OR0494 # 09 Y:2005 | 09 | 2005 | REDUCE FLUID FLOW RATES | $2,400 | $0 | Implemented |
OR0494 # 08 Y:2005 | 08 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,100 | $0 | Implemented |
OR0494 # 07 Y:2005 | 07 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,400 | $0 | Implemented |
OR0494 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,100 | $0 | Implemented |
OR0494 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $55,000 | $3,100 | Implemented |
OR0494 # 04 Y:2005 | 04 | 2005 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $36,800 | $1,400 | Not Implemented |
OR0494 # 03 Y:2005 | 03 | 2005 | REDUCE FLUID FLOW RATES | $54,700 | $630 | Implemented |