Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
110,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0828 # 10 Y:2010 | 10 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,710 | $500 | Implemented |
UD0828 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,598 | $500 | Not Implemented |
UD0828 # 12 Y:2010 | 12 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,066 | $5,000 | Not Implemented |
UD0828 # 13 Y:2010 | 13 | 2010 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,653 | $25 | Implemented |
UD0828 # 14 Y:2010 | 14 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,308 | $25 | Not Implemented |
UD0828 # 15 Y:2010 | 15 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $990 | $250 | Not Implemented |
UD0828 # 16 Y:2010 | 16 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $52,035 | $62,500 | Not Implemented |
UD0828 # 17 Y:2010 | 17 | 2010 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $15,589 | $35,000 | Not Implemented |
UD0828 # 18 Y:2010 | 18 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,601 | $25 | Not Implemented |
UM0379 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,989 | $1,350 | Implemented |
UM0379 # 05 Y:2010 | 05 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,283 | $9,861 | Implemented |
UM0379 # 04 Y:2010 | 04 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,060 | $1,500 | Implemented |
UM0379 # 03 Y:2010 | 03 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $229 | $10 | Implemented |
UM0379 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,706 | $2,000 | Implemented |
UM0379 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,353 | $14,633 | Implemented |
UA3008 # 01 Y:2010 | 01 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $6,109 | $337 | Implemented |
UA3008 # 02 Y:2010 | 02 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,598 | $17,500 | Implemented |
UA3008 # 03 Y:2010 | 03 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,470 | $2,149 | Implemented |
UA3008 # 04 Y:2010 | 04 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $12,090 | $20,526 | Not Implemented |
UA3008 # 05 Y:2010 | 05 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $497 | $340 | Not Implemented |
UA3008 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,485 | $640 | Not Implemented |
UA3008 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,619 | $1,500 | Not Implemented |
UA3008 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,004 | $16,161 | Not Implemented |
TT0052 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,444 | $3,000 | Implemented |
TT0052 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,100 | $7,000 | Not Implemented |