Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27,097
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2506 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $6,019 | $7,709 | n/a |
UW2506 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,155 | $25,000 | n/a |
UW2506 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,528 | $15,530 | n/a |
NT0045 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,667 | $138,252 | n/a |
NT0045 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $724 | $950 | n/a |
NT0045 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $13,920 | $30,800 | n/a |
NT0045 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,253 | $5,609 | n/a |
NT0045 # 06 Y:2025 | 06 | 2025 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $150,000 | $9,690 | n/a |
NT0045 # 05 Y:2025 | 05 | 2025 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $150,000 | $100,000 | n/a |
IP0213 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,498 | $13,433 | n/a |
IP0213 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,151 | $26,250 | n/a |
IP0213 # 08 Y:2025 | 08 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $48,428 | $56,200 | n/a |
IP0213 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $825 | $340 | n/a |
IP0213 # 06 Y:2025 | 06 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,346 | $3,710 | n/a |
IP0213 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $953 | $280 | n/a |
IP0213 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,943 | $4,528 | n/a |
IP0213 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,374 | $270 | n/a |
IP0213 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,623 | $640 | n/a |
IP0213 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,494 | $0 | n/a |
LS2514 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $17,210 | $96,366 | n/a |
LS2514 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,791 | $45,000 | n/a |
LS2514 # 02 Y:2025 | 02 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,979 | $12,000 | n/a |
LS2514 # 01 Y:2025 | 01 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $29,625 | $52,000 | n/a |
UF0632 # 14 Y:2025 | 14 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $1,115 | $3,888 | n/a |
UF0632 # 13 Y:2025 | 13 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $1,094 | $0 | n/a |