IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0690 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,986 $7,500 Not Implemented
MA0690 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,892 $4,075 Implemented
MA0690 # 04 Y:2012 04 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,582 $4,075 Not Implemented
MA0688 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $22,622 $21,500 Not Implemented
MA0688 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $10,004 $9,352 Implemented
MA0688 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,644 $2,250 Implemented
MA0688 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,988 $1,800 Not Implemented
MA0688 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,762 $15,050 Not Implemented
MA0688 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,689 $4,605 Implemented
MAS017 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,566 $10,000 Implemented
MAS017 # 02 Y:2012 02 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,892 $15,000 Not Implemented
MAS017 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $511 $200 Not Implemented
MAS016 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,510 $5,600 Implemented
MAS016 # 02 Y:2012 02 2012 RECOVER AND REUSE COOLING WATER $79 $375 Not Implemented
MAS016 # 03 Y:2012 03 2012 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,910 $0 Implemented
MA0683 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $24,679 $50,000 Not Implemented
MA0683 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,021 $2,800 Implemented
MA0683 # 03 Y:2011 03 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,273 $200 Implemented
MA0683 # 04 Y:2011 04 2011 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,113 $200 Implemented
MA0683 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $821 $200 Implemented
MA0683 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $486 $100 Implemented
MA0682 # 01 Y:2011 01 2011 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $29,366 $91,950 Not Implemented
MA0682 # 02 Y:2011 02 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,038 $57,600 Not Implemented
MA0682 # 03 Y:2011 03 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,594 $0 Implemented
MA0682 # 04 Y:2011 04 2011 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $10,708 $29,760 Implemented