Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,230
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0433 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $81,541 | $230,949 | Implemented |
NC0433 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,215 | $1,403 | Implemented |
NC0433 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,463 | $10,818 | Not Implemented |
NC0433 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,299 | $50 | Implemented |
NC0433 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,334 | $100 | Implemented |
NC0433 # 06 Y:2011 | 06 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,685 | $29,025 | Not Implemented |
NC0433 # 07 Y:2011 | 07 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $2,159 | $3,999 | Implemented |
NC0433 # 08 Y:2011 | 08 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $276 | $0 | Not Implemented |
MAS014 # 01 Y:2011 | 01 | 2011 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $47,869 | $10,650 | Not Implemented |
MAS014 # 02 Y:2011 | 02 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $15,371 | $17,325 | Not Implemented |
MAS014 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,256 | $8,190 | Not Implemented |
MAS014 # 04 Y:2011 | 04 | 2011 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,288 | $2,070 | Not Implemented |
MAS014 # 05 Y:2011 | 05 | 2011 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,033 | $200 | Not Implemented |
MAS014 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $700 | Not Implemented |
MAS014 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $493 | $200 | Not Implemented |
OR0574 # 01 Y:2011 | 01 | 2011 | INSTALL OCCUPANCY SENSORS | $35,460 | $21,200 | Not Implemented |
OR0574 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,450 | $7,166 | Implemented |
OR0574 # 03 Y:2011 | 03 | 2011 | REDUCE FLUID FLOW RATES | $9,209 | $15,000 | Not Implemented |
OR0574 # 04 Y:2011 | 04 | 2011 | REDUCE FLUID FLOW RATES | $13,265 | $25,000 | Not Implemented |
OR0574 # 05 Y:2011 | 05 | 2011 | REDUCE FLUID FLOW RATES | $4,812 | $18,000 | Not Implemented |
OR0574 # 06 Y:2011 | 06 | 2011 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $8,495 | $18,038 | Not Implemented |
OR0574 # 07 Y:2011 | 07 | 2011 | ADOPT IN-HOUSE MATERIAL GENERATION | $228,949 | $487,000 | Not Implemented |
IA0471 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $250 | Implemented |
IA0471 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $979 | $1,463 | Implemented |
IA0471 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,799 | $227 | Implemented |