IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0574 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $35,460 $21,200 Not Implemented
OR0574 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,450 $7,166 Implemented
OR0574 # 03 Y:2011 03 2011 REDUCE FLUID FLOW RATES $9,209 $15,000 Not Implemented
OR0574 # 04 Y:2011 04 2011 REDUCE FLUID FLOW RATES $13,265 $25,000 Not Implemented
OR0574 # 05 Y:2011 05 2011 REDUCE FLUID FLOW RATES $4,812 $18,000 Not Implemented
OR0574 # 06 Y:2011 06 2011 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $8,495 $18,038 Not Implemented
OR0574 # 07 Y:2011 07 2011 ADOPT IN-HOUSE MATERIAL GENERATION $228,949 $487,000 Not Implemented
IA0471 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $250 Implemented
IA0471 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $979 $1,463 Implemented
IA0471 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,799 $227 Implemented
IA0471 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $2,430 $3,832 Implemented
IA0471 # 05 Y:2011 05 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $465 $3,000 Implemented
IA0471 # 06 Y:2011 06 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,974 $1,500 Implemented
IC0188 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,742 $44,268 Not Implemented
IC0188 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $244 $541 Not Implemented
IC0188 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $9,096 $0 n/a
IC0188 # 04 Y:2011 04 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $285 $0 n/a
IC0188 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $422 $0 n/a
IC0188 # 06 Y:2011 06 2011 REPAIR AND ELIMINATE STEAM LEAKS $3,582 $690 n/a
IC0188 # 07 Y:2011 07 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,453 $0 n/a
MAS014 # 01 Y:2011 01 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $47,869 $10,650 Not Implemented
MAS014 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,371 $17,325 Not Implemented
MAS014 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,256 $8,190 Not Implemented
MAS014 # 04 Y:2011 04 2011 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,288 $2,070 Not Implemented
MAS014 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,033 $200 Not Implemented