Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0230 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,790 $1,000 Implemented
UU0230 # 09 Y:2023 09 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,682 $2,000 Not Implemented
UU0230 # 10 Y:2023 10 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,460 $1,000 Implemented
UU0230 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,121 $33,692 Not Implemented
UU0231 # 01 Y:2023 01 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,636 $127,500 Not Implemented
UU0231 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,519 $14,890 Implemented
UU0231 # 03 Y:2023 03 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $6,518 $19,160 Implemented
UU0231 # 04 Y:2023 04 2023 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,026 $30,128 Not Implemented
UU0231 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,898 $263,547 Implemented
UD1069 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,978 $0 Implemented
UD1069 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,796 $300 Implemented
UD1069 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,461 $952 Implemented
UD1069 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $1,403 Implemented
UD1069 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $1,799 $0 Not Implemented
UD1069 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,372 $1,389 Implemented
UD1069 # 07 Y:2023 07 2023 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $51,914 $75,982 Not Implemented
UD1069 # 08 Y:2023 08 2023 COVER OPEN TANKS $42 $2,000 Implemented
UF0602 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $848,231 $3,118,500 Not Implemented
UF0602 # 02 Y:2023 02 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $389,519 $50,482 Implemented
UF0602 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339,285 $786,250 Implemented
UF0602 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268,820 $137,250 Implemented
UF0602 # 05 Y:2023 05 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $117,532 $250,000 Not Implemented
UF0602 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,743 $322,608 Not Implemented
UF0602 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26,608 $0 Implemented
UF0602 # 08 Y:2023 08 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,084 $4,788 Implemented