IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0038 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $1,347 $1,200 Not Implemented
UF0038 # 05 Y:1992 05 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,402 $1,980 Not Implemented
UF0038 # 06 Y:1992 06 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $431 $4,943 Not Implemented
UF0038 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $659 $575 Implemented
UF0038 # 08 Y:1992 08 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,015 $0 Not Implemented
UF0038 # 09 Y:1992 09 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,296 $550 Implemented
UF0032 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,258 $4,046 Not Implemented
UF0032 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $7,907 $29,400 Not Implemented
UF0032 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,275 $6,980 Not Implemented
UF0032 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $474 $2,420 Not Implemented
UF0032 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137 $2,010 Not Implemented
UF0032 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $114 $100 Not Implemented
UF0032 # 07 Y:1992 07 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,711 $3,800 Not Implemented
UF0033 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $765 $327 Not Implemented
UF0033 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,972 $29,120 Not Implemented
UF0033 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,098 $287 Not Implemented
UF0033 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $14,800 $120,000 Not Implemented
UF0033 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,577 $7,504 Not Implemented
UF0033 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $641 $200 Not Implemented
UF0033 # 07 Y:1992 07 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $13,336 $7,000 Not Implemented
UF0034 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,358 $0 Not Implemented
UF0034 # 02 Y:1992 02 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,737 $14,960 Not Implemented
UF0034 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $18,601 Implemented
UF0034 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,299 $400 Implemented
UF0034 # 05 Y:1992 05 1992 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $51,194 $68,400 Not Implemented