IAC logo
IAC Assessment: UF0061
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0061
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1993
Principal Product Envelopes
NAICS n/a
SIC 2677 - Envelopes
Sales $5,000,000-$10,000,000
# of Employees 58
Plant Area (Sq.Ft.) 55,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,357 1,357,562 kWh $0.08
TOTAL ENERGY COSTS $106,357
RECOMMENDED SAVINGS* $21,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,195
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,496
Cost:
$247
$2,496 31,946 $2,496
31,946
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$786
Cost:
$2,604
$786 9,965 $786
9,965
kWh
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,088
Cost:
$6,904
$6,088 66,823 $6,088
66,823
kWh
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,214
Cost:
-
$2,214 28,429 $2,214
28,429
kWh
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,456
Cost:
$1,076
$1,456 18,757 $1,456
18,757
kWh
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,891
Cost:
$4,866
$1,891 24,326 $1,891
24,326
kWh
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,081
Cost:
-
$4,081 52,462 $4,081
52,462
kWh
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$290
Cost:
$134
$290 3,517 $290
3,517
kWh
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,623
Cost:
$1,440
$1,623 20,809 $1,623
20,809
kWh
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$133
Cost:
$50
$133 1,758 $133
1,758
kWh
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$719
Cost:
$2,846
$719 9,086 $719
9,086
kWh
TOTAL RECOMMENDED Savings:
$21,777
Cost:
$20,167
$21,777 267,878 $21,777
267,878
kWh
TOTAL IMPLEMENTED Savings:
$5,195
Cost:
$4,425
$5,195 66,237 $5,195
66,237
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage