Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,738
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0280 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $287 | $30 | Implemented |
LL0280 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $111 | $92 | Not Implemented |
LL0281 # 01 Y:2007 | 01 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,512 | $735 | Implemented |
LL0281 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $9,842 | $1,585 | Implemented |
LL0281 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,804 | $2,400 | Implemented |
LL0281 # 04 Y:2007 | 04 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $5,988 | $120 | Implemented |
LL0281 # 05 Y:2007 | 05 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,808 | $900 | Implemented |
LL0281 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $1,708 | $1,588 | Implemented |
LL0281 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $740 | $525 | Not Implemented |
LL0281 # 08 Y:2007 | 08 | 2007 | INSTALL OCCUPANCY SENSORS | $537 | $390 | Not Implemented |
LL0281 # 09 Y:2007 | 09 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $400 | $638 | Not Implemented |
OK0746 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,580 | $4,541 | Implemented |
OK0746 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,287 | $3,000 | Implemented |
OK0746 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $3,256 | Implemented |
OK0746 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $0 | Implemented |
OK0746 # 08 Y:2007 | 08 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $39,725 | $63,500 | Not Implemented |
OK0746 # 09 Y:2007 | 09 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $49,382 | $46,200 | Not Implemented |
OK0746 # 10 Y:2007 | 10 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $40,383 | $400 | Not Implemented |
OK0746 # 11 Y:2007 | 11 | 2007 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $30,387 | $15,000 | Not Implemented |
OK0746 # 12 Y:2007 | 12 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,000 | $840,000 | Not Implemented |
OK0746 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $32,026 | $30,757 | Implemented |
OK0746 # 02 Y:2007 | 02 | 2007 | USE SOLAR HEAT FOR HEAT | $26,050 | $140,000 | Not Implemented |
OK0746 # 03 Y:2007 | 03 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $52,302 | $14,800 | Not Implemented |
LL0267 # 01 Y:2007 | 01 | 2007 | INSULATE BARE EQUIPMENT | $23,653 | $3,315 | Implemented |
LL0267 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,665 | $30 | Not Implemented |