IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0249 # 01 Y:2000 01 2000 INSTALL SKYLIGHTS $4,840 $5,700 Implemented
UL0249 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,210 $0 Implemented
UL0249 # 03 Y:2000 03 2000 MINIMIZE WATER USAGE $3,539 $909 Not Implemented
UL0249 # 04 Y:2000 04 2000 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $1,537 $700 Not Implemented
UL0249 # 05 Y:2000 05 2000 COMBINE UTILITY METERS $3,900 $5,000 Implemented
UL0248 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,938 $15,352 Implemented
UL0248 # 02 Y:2000 02 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $51,600 $6,600 Implemented
UL0248 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $28,000 $3,318 Not Implemented
OR0375 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,778 $20,000 Implemented
OR0375 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,770 $0 Implemented
OR0375 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $2,848 $9,500 Not Implemented
OR0375 # 04 Y:2000 04 2000 REDUCE SCRAP PRODUCTION $81,000 $21,000 Not Implemented
OR0375 # 05 Y:2000 05 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $45,562 $2,451 Implemented
OR0375 # 06 Y:2000 06 2000 REDUCE SCRAP PRODUCTION $12,255 $0 Not Implemented
OR0379 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,383 $7,000 Implemented
OR0379 # 02 Y:2000 02 2000 UPGRADE CONTROLS ON COMPRESSORS $9,673 $15,010 Not Implemented
OR0379 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,146 $0 Not Implemented
OR0379 # 04 Y:2000 04 2000 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,099 $885 Implemented
OR0379 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,229 $0 Not Implemented
OR0379 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $1,715 $4,000 Not Implemented
OR0379 # 07 Y:2000 07 2000 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $9,628 $48,484 Implemented
OR0379 # 08 Y:2000 08 2000 OPTIMIZE PLANT POWER FACTOR $7,013 $19,600 Not Implemented
OR0379 # 09 Y:2000 09 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,026,000 $1,337,500 Not Implemented
MS0169 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $7,083 $0 Implemented
MS0169 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $532 $193 Implemented