IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0602 # 09 Y:2023 09 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $341,860 $20,000 Implemented
UF0602 # 10 Y:2023 10 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $215,016 $0 Implemented
LS2023 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $56,174 $1,000 Implemented
LS2023 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $3,665 $1,400 Not Implemented
LS2023 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $189,746 $142,240 Not Implemented
LS2023 # 04 Y:2023 04 2023 REDUCE HEAT GAIN BY WINDOW TINTING $6,749 $10,831 Not Implemented
LS2023 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,548 $14,800 Implemented
LS2023 # 06 Y:2023 06 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $193,754 $552,840 Implemented
LS2023 # 07 Y:2023 07 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $17,898 $60,000 Not Implemented
AS0564 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,388 $182,064 Not Implemented
AS0564 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,294 $1,654 Implemented
AS0564 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,752 $63 Implemented
AS0564 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,251 $143 Implemented
AS0564 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $945 $110 Not Implemented
AS0564 # 06 Y:2023 06 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $463 $71 Not Implemented
AS0564 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29 $79 Implemented
CI0023 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $78,738 $658,288 n/a
CI0023 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $45,480 $17,533 n/a
CI0023 # 03 Y:2023 03 2023 REPLACE BOILER $13,894 $30,000 n/a
CI0023 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,902 $300 n/a
CI0023 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $7,791 $2,625 n/a
CI0023 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,881 $2,299 n/a
CI0023 # 07 Y:2023 07 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,670 $7,500 n/a
CI0023 # 08 Y:2023 08 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,797 $5,000 n/a
CI0023 # 09 Y:2023 09 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $13,000 n/a