IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0037 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,684 $1,755 Implemented
ND0037 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,425 $500 Implemented
ND0037 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $476 $496 Implemented
WI0154 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,712 $160,000 n/a
WI0154 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $6,762 $1,000 n/a
WI0154 # 03 Y:1992 03 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,277 $0 n/a
WI0154 # 04 Y:1992 04 1992 AIR CONDITION ONLY SPACE NECESSARY $5,948 $0 n/a
WI0154 # 05 Y:1992 05 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,359 $7,700 n/a
WI0154 # 06 Y:1992 06 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,257 $10,000 n/a
WI0154 # 07 Y:1992 07 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,040 $1,000 n/a
WI0154 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $356 $1,280 n/a
WI0154 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $799 $8,758 n/a
WI0150 # 01 Y:1992 01 1992 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $51,435 $27,000 Not Implemented
WI0150 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,318 $10,089 Not Implemented
WI0150 # 03 Y:1992 03 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,493 $0 Not Implemented
WI0150 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $2,039 $600 Not Implemented
WI0150 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,358 $0 Not Implemented
WI0150 # 06 Y:1992 06 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,658 $5,000 Not Implemented
WI0150 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $424 $500 Not Implemented
WI0150 # 08 Y:1992 08 1992 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $949 $0 Not Implemented
WI0150 # 09 Y:1992 09 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $436 $800 Not Implemented
WI0151 # 01 Y:1992 01 1992 INSTALL TIMERS AND/OR THERMOSTATS $4,528 $200 Not Implemented
WI0151 # 02 Y:1992 02 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $783 $0 Not Implemented
WI0151 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,055 $0 Not Implemented
WI0151 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $134 $9 Implemented