IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,647

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT8385 # 01 Y:2023 01 2023 PAY BILLS ON TIME TO AVOID LATE FEES $6,415 $0 n/a
LT8385 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $705 n/a
LT8385 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,834 $7,403 n/a
UF0604 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $48,311 $293,280 Not Implemented
UF0604 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,577 $37,582 Implemented
UF0604 # 03 Y:2023 03 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,590 $37,275 Implemented
UF0604 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,173 $0 Implemented
UF0604 # 05 Y:2023 05 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,430 $780 Implemented
UF0604 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,334 $6,383 Not Implemented
UF0604 # 07 Y:2023 07 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $63,559 $10,000 Implemented
UF0604 # 08 Y:2023 08 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $10,959 $0 Implemented
UL2313 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,411 $30,977 Not Implemented
UL2313 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,325 $2,880 Not Implemented
UL2313 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,566 $0 Not Implemented
UL2313 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,515 $14,625 Not Implemented
UL2313 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $95,755 $917,406 Not Implemented
UL2313 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,989 $15,000 Not Implemented
UU0238 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $13,223 $4,080 Implemented
UU0238 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,624 $12,621 Implemented
UU0238 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $7,670 $22,500 Not Implemented
UU0238 # 04 Y:2024 04 2024 CLEAN CONDENSER TUBES $3,894 $3,890 Implemented
UU0238 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,731 $5,916 Implemented
KS2323 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $105,434 $423,259 n/a
KS2323 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,211 $5,240 n/a
KS2323 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $60 n/a