IAC logo
IAC Assessment: UF0604
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 10
Plant Area (Sq.Ft.) 540,000
Annual Production 2,226,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $633,216 7,141,473 kWh $0.09
Electricity Demand $1 13,433 kW-months/year $0.00
Electricity Fees $56,064 - $ -
TOTAL ENERGY COSTS $689,281
RECOMMENDED SAVINGS* $168,933 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$48,311
Cost:
$293,280
$48,311 542,823 - - $48,311
542,823
kWh
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$30,577
Cost:
$37,582
$30,577 343,560 - - $30,577
343,560
kWh
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$8,590
Cost:
$37,275
$8,590 96,514 - - $8,590
96,514
kWh
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,173
Cost:
-
$3,173 35,650 - - $3,173
35,650
kWh
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$2,430
Cost:
$780
$2,430 27,300 - - $2,430
27,300
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,334
Cost:
$6,383
$1,334 14,990 - - $1,334
14,990
kWh
-
-
$
07: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$63,559
Cost:
$10,000
$63,559 714,147 - - $63,559
714,147
kWh
-
-
$
08: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$10,959
Cost:
-
- - $10,959 - -
-
kWh
$10,959
-
$
TOTAL RECOMMENDED Savings:
$168,933
Cost:
$385,300
$157,974 1,774,984 $10,959 - $157,974
1,774,984
kWh
$10,959
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes